Consultor Eletrônico



Kbase P103792: Redo phase is taking longer and longer
Autor   Progress Software Corporation - Progress
Acesso   Público
Publicação   20/01/2009
Status: Verified

SYMPTOM(s):

Redo phase takes unexpectedly long time

Long delay between the two messages 5326 and 7161

Begin Physical Redo Phase at <current address>. (5326)

Physical Redo Phase Completed at blk off upd . (7161)

FACT(s) (Environment):

Progress 9.1D
Progress 9.1E
OpenEdge 10.0X
All Supported Operating Systems

CAUSE:

This is a known issue being investigated by Development.

FIX:

Truncate the Before Image with the command:
proutil <db> -C truncate bi