Kbase P48318: Is there a way to return control to the user immediately aft
Autor |
  Progress Software Corporation - Progress |
Acesso |
  Público |
Publicação |
  15/10/2003 |
|
Status: Unverified
GOAL:
Is there a way to return control to the user immediately after invoking an internal procedure that generates a lengthy report?
FIX:
There is no way to return control to the user after calling an internal procedure that generates a lengthy report before that procedure is fully executed.
A work around may be to write the procedure as an external procedure and run it in a separate Progress session.