Consultor Eletrônico



Kbase P23820: Is it possible to perform multiple proutil tablemove simulta
Autor   Progress Software Corporation - Progress
Acesso   Público
Publicação   25/11/2003
Status: Unverified

GOAL:

Is it possible to perform multiple proutil tablemove simultaneously?

FIX:

It is possible to run multiple simultaneous proutil tablemove's.

Each tablemove will lock the _storageObject record(s) for the table and possibly its indices depending upon the user's request. In addition, it will obtain an exclusive table lock on the table being moved.